Mudcat Café message #4000709 The Mudcat Café TM
Thread #165433   Message #4000709
Posted By: Stilly River Sage
14-Jul-19 - 01:03 PM
Thread Name: De-clutter & Fitness: House, job, life - 2019
Subject: RE: De-clutter & Fitness: House, job, life - 2019
The ceiling and walls in the office have a coat of primer now, and it used the entire gallon. The hall comes next, after a cool down, and should require approximately a half-gallon. The part so far is the roller, the brush work to fill in crevices and corners comes next, after the walls are dry.

I'll paint the ceilings later today, and be ready for the A/C vent to be reinstalled in the office. I have a box in the sunroom for things that I come across still that will go to Goodwill. The leaded glass light cover from the hall, a couple of things pulled out of the pantry, it's slowly filling. The recycling bag (that lives in the sunroom) was emptied a couple of days ago. Some of the "normal" sunroom items are lined along the cabinets in the kitchen. This causes a tripping hazard in there, but makes the sunroom more navigable during the construction process.

Charmion, I should have realized it was the "down" position of the desk that was the problem. I also find mine just a little taller than I like, and my chair doesn't raise enough to compensate. I've thought about putting an under-desk tray in for the keyboard, but the steel supports of the desk itself are in the way.

My afternoon yesterday was taken up attending a funeral service, after which an old friend followed me home to poke around in the yard, so I didn't get back to the chipping project. Today is a painting day, so probably tomorrow morning I'll do more trimming and get started with the chipper.