Mudcat Café message #4000051 The Mudcat Café TM
Thread #165433   Message #4000051
Posted By: Stilly River Sage
09-Jul-19 - 03:42 PM
Thread Name: De-clutter & Fitness: House, job, life - 2019
Subject: RE: De-clutter & Fitness: House, job, life - 2019
So I've figured out a schedule - the question "do you want paint" wasn't did I want them to paint, but do I want the walls fixed for new paint (after the damage of sheet rock work). So, once I decide on the color, I'll paint. It takes a couple of days for the texture to dry enough to paint. They'll leave the plastic down on the floor so I can paint without worrying about dripping. I'm still lining up my electrician and AC guy for their part of this job.

I will be able to take down MY plastic sheeting for passage through the hall and air circulation, will get a package of Attic Dek panels, and start the work of putting insulation back in the attic over this area. These are concurrent activities, basically arranged so any attic work is in the early morning when it's cooler. I may get the insulation into place before I finish the painting. Being a hot climate and all.

I hear a compressor running out in the driveway, so I think the texture is being applied.